Back to Main Page

Keosauqua Bridge Replacement

 

Not much in the way of exciting photographs are coming my way. So, I added some information about a great engineer who combined aesthetics and structural design. The bottom image is a cadd drawing I did when I was analyzing a single span concrete arch.

The first stage of the new bridge is scheduled to open in November and I should get some great pictures of the old bridge being removed.

 

 

 

Nieko Design | Projects | Aesthetics | Publications | Water | Blog | News | Stuart Nielsen