Back to Main Page

Keosauqua Bridge Replacement

 

Picture posting will be sporadic for a little while. But eventually great pictures of the first stage bridge opening and removal of the old bridge will be posted. Then construction begins on the second stage. The second stage consists of widening the new bridge toward the old bridge.

 

 

 

Nieko Design | Projects | Aesthetics | Publications | Water | Blog | News | Stuart Nielsen